• Grup Heracles

    STABILISATION ROC DELS CORBS. PHASE VI

Stabilisation Roc dels Corbs. Phase VI
Andorra la Vella (Andorra)

INACCÉS S.L.

Stabilisation Roc dels Corbs slope at La Solana d’Andorra la Vella, using  high bearing capacity mesh and network triple torsion to protect the built-up area, one where there is a high risk of rockfalls.

  • GRUP HERACLES

  • Av. Consell de la Terra 14-16
  •    AD700 Escaldes-Engordany
  •    Principat d'Andorra
  • +376 805 600

CONTACT FORM