    EXCAVATION CYNA PHASE 2

EXCAVATION CYNA PHASE 2
Andorra la Vella

TREPO S.A.

So that the Cyna residential building can be constructed, demolition work has been carried out on the existing building on Avinguda Meritxell, 9,000m3 of rock has been excavated on the plot, and the ground has been contained through micropiles, passive and active anchoring and shotcrete.